To help accomodate the large numbers of students in the town of Zwolle (NL), three residential towers have been built. The buildings have been realized by the "tunnel building" technique. When using these building method, the walls and floors are at once poured in to the framework. A high building tempo and a tight working schedule are characteristic by using this technique. 

 

To minimize the risks of onforseen happenings contractor Wessels Rijssen appealed to HERTALAN®. In order to close the joints around window frames airtight, Wessels Rijssen has used pre-fabricated Hertalan EPDM window sleeves.